Free mold detection device application+inhibition rate calculator+10-year warranty plan attached
1、 Tropical Rainy Season: Economic and Health Costs of Fungal Disasters
1. 2024 Southeast Asia Mold Pollution Map

Country | Roof mold coverage during rainy season | Annual economic losses | Increase in respiratory diseases |
---|---|---|---|
Indonesia | 78% | $230 million | +39% |
Philippines | 65% | $170 million | +27% |
Malaysia | 53% | $110 million | +18% |
2. The True Cost of Traditional Cleaning Solutions
Kuala Lumpur Residential Area Case:
Clean with high-pressure water gun and chlorine acid:
-Single cleaning fee: $4.2/m2
-Annual cleaning frequency: 3 times
-5-year total cost: $63000 (100 ㎡ roof)
Comparison of SKW anti moss solutions:
Initial cost: $38/m ²
10-year maintenance cost: $0
Total cost savings rate: 59.3%
2、 Technical revolution of moss prevention: from chemical disinfection and sterilization to physical defense
1. SKW NanoGuard ™ Quadruple protection system

- Photocatalytic coating :
-Titanium dioxide nanoparticles (particle size 25nm)
-Decomposition of organic matter under UV light (decomposition rate 92%) - Micron level texture :
-Surface roughness Ra=1.8 μ m (spore attachment area reduced by 76%)
-3D guide groove accelerates water evaporation (drying time ≤ 2 hours) - Ion suppression layer :
-Silver ion slow-release technology (Ag+concentration 0.8ppm)
-Destruction of algal cell wall (inhibition rate 99.2%) - Self cleaning substrate :
-Fluorocarbon resin back coating (contact angle ≥ 160 °)
-Rainwater erosion residue removal rate ≥ 95%
2. Laboratory extreme environment testing data
Testing Standards | SKW Anti Moss Tile | Traditional Concrete Tile |
---|---|---|
ASTM G21 (Fungi) | Grade 0 (No Growth) | Grade 4 (Severe Coverage) |
ISO 22196 (Bacteria) | Inhibition rate 99.8% | Inhibition rate 12.3% |
Accelerated aging for 3000 hours | Decrease in anti moss performance ≤ 3% | Decrease in performance by 58% |
3、 Practical comparison: 12 months of actual testing in the rainforest area of Malaysia
1. Test environment parameters
-Location: Sabah Tropical Rainforest Reserve
-Annual average rainfall: 4200mm
-Relative humidity: 85% -98%
2. Monthly mold coverage monitoring
Month | SKW Anti Moss Tile | Ordinary Colored Stone Tile | Asphalt Tile |
---|---|---|---|
1st month | 0% | 7% | 15% |
3rd month | 0.3% | 23% | 41% |
June | 0.8% | 55% | 89% |
December | 1.2% | 82% | Decayed |
3. Comparison of Maintenance Costs (100 ㎡ Roof)
Project | SKW Anti Moss Tile | Traditional Solution |
---|---|---|
Cleaning agent cost | $0 | $420/year |
Labor cost | $0 | $780/year |
Waterproof layer repair fee | $0 | $2300/time |
4、 Customized solution and intelligent management of anti moss system
1. Three step selection method
- Risk Diagnosis :
[Online Mold Risk Test]
-Upload roof photos to automatically analyze pollution levels - Scheme Matching :
Pollution level | Recommended model | Antibacterial protection |
Mild (<20%) | SKW GuardLite | 5-year zero moss commitment |
Moderate (20% -50%) | SKW GuardPro | 8-year warranty+free testing |
Severe (>50%) | SKW GuardMax | 10-year warranty+insurance payout |
3. Intelligent monitoring :
-Real time monitoring of humidity/spore concentration by IoT sensors
-Automatically push cleaning alerts (APP/SMS notifications)
2. Government subsidies and green finance
-DKI Jakarta Special Zone in Indonesia: Moss prevention renovation subsidy of $8/m ²
-Malayan Bank Green Loan: Interest rate discount of 1.5%
-Thailand BOI tax reduction: up to 30% exemption from corporate income tax
5、 Successful case: Record of hotel renovation in Bandung, Indonesia
1. Project Challenge

-The average fungal coverage rate on the roofs of 36 villas is 65%
-Simultaneously addressing the issues of moss prevention and architectural aesthetics
-The construction window period during the rainy season is only 11 days
2. SKW Solution
-Customized grapefruit wood grain anti moss tile
-Drone spraying pre-treatment agent (completed 50000 square meters in 3 hours)
-Implant humidity sensor network
3. Transformation achievements
Indicator | Before renovation | After renovation |
---|---|---|
Customer complaint rate | 43% | 2% |
Maintenance cost | $2000/month | $300/month |
Booking rate increase | – | +22% |
6、 Immediate action: Rainy season protection time limited package
1. Free application for testing tool worth $500
-Moss prevention detector function :
✅ Real time monitoring of spore concentration
✅ Humidity/temperature data recording
✅ Intelligent warning push
2. Southeast Asia Localization Service Network
-48 hour emergency response:
Direct delivery from Jakarta/Manila/Kuala Lumpur warehouses
-Interest free installment plan:
12 term zero interest rate, with a down payment of only 10%